This year’s DSEI was one of the busiest to date for Cook & Associates, supporting five clients with a 7-day build-up period as well as the 4 show days.

As always, there were some interesting construction challenges for our 25-strong onsite team!

These included accommodating a larger than expected mine clearing vehicle to feature on the front of Pearson Engineering’s stand – a giant exhibit at some 7m long by nearly 4m wide!

Eye-catching stands for Revision Military, FLIR Systems, Pearson Engineering and MOOG were matched by the largest ever for Ultra Electronics.

High profile events such as DSEI pose some off the floor challenges as well – with security at an all-time high, contractors including our team spent a fair bit of time either getting locked into the site or locked out, sometimes for hours at a time! Never a dull moment…..

Hear what three of our clients had to say here:  Testimonials